Green Building

Hotel Bathrooms Pods

We offer a comprehensive range of high-quality Hotel bathroom pods and have unparalleled experience in design, manufacture, and supply for the hospitality sector. Bathroom pod designs can either be selected from the wide variety of popular footprints in our design library or new bespoke designs can be developed to meet individual project requirements.

Green Building

Hospital Bathrooms Pods

Construction projects in the healthcare sector need to adhere to stringent and exacting standards. At The Pod Company, we understand these needs and provide fully compliant bathroom pods as an alternative to traditional build. Our healthcare pods offer a durable, robust and hygienic finishes.

Green Building

Apartment Bathrooms Pods

Our prefabricated bathroom pods are ideal for residential developers looking for a better value alternative to traditional bathroom construction. We offer superior quality without compromising design flexibility. In fact, they’re custom-designed to your specifications, from a wide selection of quality finishes and fittings, making them ideal for apartments of all styles and budgets.

Green Building

Student Accomodation Bathrooms Pods

Factory built bathroom pods are also ideal for student accommodation again primarily due to the design repetition that is found in these type of projects. Our bathroom pods are low maintenance, durable, easy to clean, lightweight and are available in four standard footprints.

The Pod Company

A Speed House Group Company

The POD Company is established by a team of well experienced and technically strong professionals with more than 30 years of combined experience with pre-engineered bathroom pods, in Europe and 10 years in the UAE. Within the team we have estimated, designed, project managed and installed bathroom pods into hotels, universities, villas and high rise commercial and residential buildings, and we are dedicated to finding the best functional and esthetic solution for each bespoke project, should that be a 5 star hotel room or a student accommodation solution to a given branded specification or suggested by our design team with a wide program from some of our good suppliers on the market. The POD Company is a company under the umbrella of the well-established Speed House Group of Companies, already dealing with the offsite construction of lightweight steel houses, production of GRC as well as building material supply for GCC and the UAE market.

View SHG Webiste
Consistent quality
Consistent quality

All pods are cast in the same mould, when the reference pod quality is signed off that is then the minimum standard to be supplied.

Less snagging
Less snagging

Considerably less requirement for snagging later on in the often hectic finishing stage of the project.

Time saving on build program
Time saving

On total build program

Project specific Design
Project specific Design

The bathroom is designed and built by an experienced team, specialized in bathroom design and manufacture.

Less crane time
Less crane time

one lift with the crane and all materials and the delivery is completed, no need for pallets of each single item to be send to each floor then each room, etc

Less workers, and supervision on site.
Less workers & supervision on site.

The bathrooms are normally one of the rooms that requires most attention, and from up to 6 or 8 different trades, so a lot less labor, coordination and supervision on site is required.

No on site storage restriction
No storage restriction

With pods no need for storage of materials for bathrooms on site.

One point of contact
One point of contact

No inter-trade or company arguments because we are from the same company and it all coordinated, and therefore no delays.

Pod Easy maintenance
Easy maintenance

Pods installed back to back and location of all the services in the riser shaft gives easy access for maintenance.

Fully tested
Fully tested

Pods are delivered fully tested and our team will be on site when water and power is connected to the building to do the commissioning.

Pods Profitable For Owners
Fixed Price

Fixed price is agreed on the specific specification so no surprises, as long as order is received drawings and specification is signed off in time to order and get the materials delivered, responsibility for on time delivery is on the pod supplier

Fast Installation
Fast Installation

The speed of installation on site, 20-30 pods can be positioned a day, and pods can also be installed through the night.

Mould Making
1
Casting
2
Demounting
3
Floor Waterproofing
4
Floor Tiling
5
Pod Assembly
6
Wall Waterproofing
7
Wall Tiling
8
Electrical and Plumbing
9
Leak Testing
10
Finished Pod
11
Truck Loading
12

Like to Read More About Us, Download our Corporate Brochure

The-Pod-Company-Brochure.pdf

Pod Production Video

Major Clients

Client logo
Client logo
Client logo
Client logo
Client logo
Client logo